• P-01
    AMPHIBIOUS EXCAVATOR
    Higher Travelling Speed and Momentum
  • P-02
    LONG REACH
    Maximizing Digging Depth and Forward Reach
  • P-03
    BUCKET
    Designed for Different Excavation Work
  • P-04
    AMPHIBIOUS EXCAVATOR
    With HSP TRACK SHOE
  • P-05
    AMPHIBIOUS EXCAVATOR
    Maneuver in Swampy Area or Open Water
  • P-06
    FORK GRAPPLE
    Material Handling Application
  • P-07
    AMPHIBIOUS EXCAVATOR
    With Patented Multi-Synchronous Drive System

TR 200

TR 200 Design For 20 - 22 ton Class Excavator




NO PART ft m
A
Track Length On Ground 13’ 7” 4.15
B
Maximum Track Length 31’ 7” 9.63
C
Rear Upperstructure Length 9’ 2.75
D
Overall Length 44’ 6” 13.55
E
Height Of The Boom 11’ 5” 3.457
F
Upperstructure Clearance 7’ 1” 2.17
G
Overall Width (min/max) 17’ 4”/20’ 5.29/6.09
H
Track Width (min/max) 16’ 5”/19’ 5.00/5.80
I
Track Gauge (min/max) 11’/13’ 9” 3.38/4.18
J
Pontoon Width 5’ 4” 1.62
K
Minimum Ground Clearance 4’ 3” 1.3
L
Track Height 6’ 8” 2.03
M
Overall Cab Height 13’ 5” 4.08
N
Upperstructure Overall Width 8’ 10” 2.7
P
Estimated Water Level 5’ 1” 1.55

- Based on TSBC 14 meter Long Reach Package

- Dimension based on estimation